Technical Coordinator / Outage Superintendent

Description du poste

Job Description
SNC-Lavalin has also designed, built and is currently operating and maintaining a thermal combined-cycle power plant in Hadjret en Nouss that will supply an additional 1,227 MW of capacity to Algeria's power grid. Power is generated by three GE single-shaft power trains with the plant operating on natural gas as the primary fuel and light oil as a backup fuel. While the plant was nearing completion in 2009, SNC-Lavalin began a separate mandate to operate and maintain the facility for 20 years. SNC-Lavalin has a 26% ownership interest in the Hadjret en Nouss utility.

Responsibilities:

Maintenance, revamping, upgrade scheduling support
Power Train supervision (Gas Turbine, Steam Turbine, Generator, Auxiliaries)
Preparation and submission of outages reports
Perform troubleshooting tasks, and Technical support for RCA
Ensure the respect of procedures, good industrial practices and technical standards;
Interpretation of schematic drawings and blueprints

Requirements:

Technical education (Mechanical and/or Electro-mechanical)
Minimum of 15 years of experience in a similar role, specifically on a combined cycle power plant
Previous experience working on an international project
Experience with LTSA Contracts Contractors Management (GE, etc.)
Experience with implementation of Quality and Safety Standards/Procedures
Documented experience as TA for major outages (GT, ST, Gen).